Energy certification of an office building

Energy certification is presented as a very useful tool by offering information on energy efficiency, associated energy consumption and the CO2 emissions that such consumption generates, so looking for opportunities to save electricity in buildings through energy certification, It is presented as an...

Descripción completa

Autores Principales: Castro-Fernández, Miguel, Vilaragut Llanes, Miriam, Oloroun-Shola Bissiriou, Aziz
Formato: Artículo
Idioma: Español
Publicado: Editorial Tecnológica de Costa Rica (entidad editora) 2021
Materias:
Acceso en línea: https://revistas.tec.ac.cr/index.php/tec_marcha/article/view/6015
https://hdl.handle.net/2238/13625
Sumario: Energy certification is presented as a very useful tool by offering information on energy efficiency, associated energy consumption and the CO2 emissions that such consumption generates, so looking for opportunities to save electricity in buildings through energy certification, It is presented as an opportunity that in Cuba has not yet been exploited. In this work, a study is developed on the application of the procedure applied in the European Community to certify buildings already built, and a group of energy efficiency measures and the possible use of Renewable Energy Sources in the building underneath are proposed. study, with the objective of raising the initial certification granted. For this, the CE3X software is applied, which allows evaluating the energy consumption indicators and the amount of CO2 emissions, associated with said consumption, which is released into the atmosphere. As a conclusion, it is obtained that the building has a high energy consumption, being a fundamental element the consumption that it has in the air conditioning system. This problem allowed for detailed proposals, resulting in 43% annual energy savings and 52% of global CO2 emissions. The measures proposed to achieve the above are economically justified by the values  of the Net Present Value (NPV) calculated, based on a total investment to satisfy the chosen improvements of € 36,300.00, estimating that in 8 years the entire investment will have been recovered.