Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.

Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2012.

Autor Principal: Abarca-Durán, Danny
Formato: Tesis
Idioma: Español
Publicado: Instituto Tecnológico de Costa Rica. Escuela de Construcción 2013
Materias:
Acceso en línea: https://hdl.handle.net/2238/3025
id RepoTEC3025
recordtype dspace
spelling RepoTEC30252022-04-09T03:05:53Z Estudio preliminar para la instalación de una Microcentral Hidroeléctrica. Abarca-Durán, Danny Return flow Electromechanical equipment Powerhouse Micro-hydropower Conduction system Water harvesting Microcentral Caudales Casa de máquinas Equipo electromecánico Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2012. El trabajo realizado corresponde a un estudio preliminar para la instalación de una microcentral hidroeléctrica que se ubicará en la Zona de los Santos. La normativa necesaria para la realización del proyecto fue consultada en fuentes bibliográficas, además se realizaron consultas a ingenieros, empresas e instituciones relacionadas e involucradas en el campo de la generación de energía. Con el fin de obtener los datos necesarios para el desarrollo del proyecto se realizó un levantamiento topográfico del sitio seleccionado para determinar así la diferencia de altura existente entre los puntos de interés, luego se recopiló gran cantidad de información sobre mediciones de caudal y datos de precipitación referentes a la cuenca donde se pretende instalar la microcentral; esto mediante consultas a instituciones y algunas estaciones meteorológicas. Seguidamente, sé llevó a cabo la selección del equipo electromecánico, el cálculo de la capacidad de generación de la planta (aproximadamente 7 kW) y con base a esta información se realizó un diseño preliminar donde se incluyen detalles de los elementos a construir, como las estructuras para la captación de agua, un posible dimensionamiento de la casa de maquinas, el sistema de conducción y la restitución del caudal turbinado. También se realizó un presupuesto preliminar de los costos de construcción de las obras y la inversión necesaria para la compra del equipo de generación. __________________________________________________________________ This work corresponds to a preliminary study for the installation of a micro-hydropower that will be located in La Zona de Los Santos. The legislation required to implement the project was consulted in bibliography sources. Also, were consulted engineers and companies involved in power generation. In order to obtain the necessary information for the development of the project was necessary a survey of the selected site to determine the height difference between the points of interest. Then, was a must to collect lots of information on flow measurements and data precipitation related to the basin where the micro- hydropower will be installed. That work was done by consulting institutions and some weather stations. Then, was mandatory to carry out the selection of electromechanical equipment, calculation of the generating capacity of the plant (about 7 Kw), and based on this information, a preliminary design which includes details of the elements to build, for example the structures for water harvesting, sizing a potential powerhouse, the conduction system, and the return flow. Also, we realized a preliminary budget for the construction costs of the works and the investment required to get the generating equipment. 2013-03-08T12:40:30Z 2013-03-08T12:40:30Z 2012 licentiateThesis https://hdl.handle.net/2238/3025 es application/pdf Instituto Tecnológico de Costa Rica. Escuela de Construcción
institution Tecnológico de Costa Rica
collection Repositorio TEC
language Español
topic Return flow
Electromechanical equipment
Powerhouse
Micro-hydropower
Conduction system
Water harvesting
Microcentral
Caudales
Casa de máquinas
Equipo electromecánico
spellingShingle Return flow
Electromechanical equipment
Powerhouse
Micro-hydropower
Conduction system
Water harvesting
Microcentral
Caudales
Casa de máquinas
Equipo electromecánico
Abarca-Durán, Danny
Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.
description Proyecto de Graduación (Licenciatura en Ingeniería en Construcción). Instituto Tecnológico de Costa Rica. Escuela de Ingeniería en Construcción, 2012.
format Tesis
author Abarca-Durán, Danny
author_sort Abarca-Durán, Danny
title Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.
title_short Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.
title_full Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.
title_fullStr Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.
title_full_unstemmed Estudio preliminar para la instalación de una Microcentral Hidroeléctrica.
title_sort estudio preliminar para la instalación de una microcentral hidroeléctrica.
publisher Instituto Tecnológico de Costa Rica. Escuela de Construcción
publishDate 2013
url https://hdl.handle.net/2238/3025
_version_ 1796143218144837632
score 12.231669