Evaluación de la infraestructura de la sala de Hemodiálisis de Metro1 (CSS), basada en la guía para el diseño y construcción de instalaciones hospitalarias y atenciones médicas de la AIA-FGI, realizado en el 1er semestre del 2018.
This research project tries to show concept, characteristics and fundamentals of the hospital design, specifically of a hemodialysis area, which will guide the biomedical engineers as well as the professionals related to suitable infrastructure of the facilities where this kind of medical attenti...
Autor Principal: | Vega Acosta, Diomedes Gabriel |
---|---|
Otros Autores: | Ortega, Samuel |
Formato: | Tesis |
Idioma: | Español |
Publicado: |
Universidad Especializada de las Américas
2020
|
Materias: | |
Acceso en línea: |
http://repositorio2.udelas.ac.pa/handle/123456789/262 https://doi.org/10.57819/bydy-j334 |
Sumario: |
This research project tries to show concept, characteristics and fundamentals of the hospital
design, specifically of a hemodialysis area, which will guide the biomedical engineers as well as
the professionals related to suitable infrastructure of the facilities where this kind of medical
attention is offered.
A comparison was made of certain aspects of hospital design of the Metro 1 CSS hemodialysis
room against FGI Guidelines for Design and Construction of Hospitals and Outpatient Facilities
AIA-FGI, using a weighting grid that was used as an instrument to set whether or not it meets
each requirement.
The data collected in this study was analyzed, obtaining as a result that the hemodialysis room
that was the subject of study, meets 73.12% with the requirements of the regulations. The
26.88% that does not comply corresponds to the infrastructure characteristics indicated in the
Standard, which are mainly related to opportunities for improvement in the areas of patient
support and hospital medical care staff. These areas have been proposed in the
recommendations to be improved in future hospital facilities |
---|